Mt. Adatara
Mt. Adatara (安達太良山) is a 1,700m peak in central Fukushima Prefecture, counted among the 100 Famous Japanese Mountains.
The overall mountain shape is gentle, and the ski-area gondola lift between Okudake and Mt. Yakushi runs seasonally (April 11 – November 23 in 2026), comfortably reaching about 1,300m elevation — making it accessible even for beginners.
From Nihonmatsu Station on the JR Tohoku Main Line, access the Okudake Trailhead by bus or taxi.
*Timetable last checked: July 3, 2026
How to access the trailheads
- [Outbound] Nihonmatsu Station → Okudake Trailhead (taxi)
- [Outbound] Nihonmatsu Station → Okudake Trailhead (bus)
- [Outbound] Nihonmatsu Station → Shiozawa Trailhead
- [Return] Okudake Trailhead (Adatarayama Ropeway) → Nihonmatsu Station
- [Return] Shiozawa Trailhead → Nihonmatsu Station
Hiking Course Details — Mt. Adatara
Click to show current location.
Click for full-screen view.
*If the map does not appear, please click here.*
Map & Recommended Route — Mt. Adatara
Mt. Adatara — Reference Hiking Times
| Segment | Distance | Ascent/Descent | Forward | Reverse |
|---|---|---|---|---|
| Mt.Yakushidake Summit (薬師岳山頂) → Sen-nyo-daira Fork (仙女平分岐) | 1.2 km | +132 m / −0 m | 0:30 | 0:25 |
| Sen-nyo-daira Fork (仙女平分岐) → Mt. Adatara (安達太良山) | 1.0 km | +196 m / −0 m | 0:35 | 0:30 |
| Mt. Adatara (安達太良山) → Mine no Tsuji (峰の辻) | 1.2 km | +6 m / −132 m | 0:30 | 0:35 |
| Mine no Tsuji (峰の辻) → Kurogane-koya Hut (くろがね小屋) | 0.9 km | +0 m / −201 m | 0:25 | 0:35 |
| Kurogane-koya Hut (くろがね小屋) → Seishihei Fork (勢至平分岐) | 1.2 km | +14 m / −56 m | 0:25 | 0:25 |
| Seishihei Fork (勢至平分岐) → Okudake Trailhead (奥岳登山口) | 2.8 km | +17 m / −383 m | 1:05 | 1:25 |
| Total | 8.3 km | +365 m / −773 m | 3:35 | 3:50 |
1. [Outbound] Nihonmatsu Station → Okudake Trailhead (taxi)
From JR Nihonmatsu Station, take Showa Taxi’s “Taxi + Ropeway Round-trip Set, Adatara Kogen Resort direct service.”
Travel time: about 30 minutes (Nihonmatsu Station → Okudake)
Fare: Taxi + Ropeway round-trip set, 2-person use ¥7,700/person, 3-person ¥6,300/person, 4+ persons ¥5,200/person
※ Local bus option: Nihonmatsu Station Mae → Okudake Trailhead ¥800 (about 45 minutes)
Details:
2. [Outbound] Nihonmatsu Station → Okudake Trailhead (bus)
From in front of Nihonmatsu Station, take the Fukushima Kotsu bus bound for Okudake.
Operating period:
Weekdays: year-round
Sat/Sun: Sat/Sun only from May 9 – May 31, 2026 (Shinryoku-go) / extra mountain-opening services on Sunday May 17
※ During autumn-foliage season (October – November), Kinshu-go is scheduled to operate
Travel time: 45 minutes
Fare: ¥800
Reference: Fukushima Kotsu “Okudake Service / Shinryoku-go” 2026 edition
From the Okudake Trailhead to the Mt. Yakushi summit, the ropeway is available.
The Adatarayama Ropeway links the Okudake Trailhead (base station) with Mt. Yakushi (summit station) and runs from April 11 to November 23 in 2026. Hours are 8:30 AM–4:30 PM (last ride up 3:50 PM, last ride down 4:20 PM), the adult fare is ¥1,300 one way / ¥2,200 round trip, and it is suspended in bad weather. For a day trip, note that the last return bus leaves the Okudake Trailhead at 16:15, so plan to descend in good time to catch it.
Bus TimetableNihonmatsu Station → Okudake Bus Timetable
| Nihonmatsu Station | Okudake Trailhead |
|---|---|
| 8:13 | 8:58 |
| Nihonmatsu Station | Dake Onsen Arr. | Dake Onsen Dep. | Okudake Trailhead |
|---|---|---|---|
| 8:15 | 8:45 | 8:45 | 9:05 |
| 9:28 | 9:53 | 9:55 | 10:15 |
| 12:23 | 12:48 | 12:50 | 13:10 |
Reference: [Fukushima Kotsu]
3. [Outbound] Nihonmatsu Station → Shiozawa Trailhead
From in front of Nihonmatsu Station, take the Fukushima Kotsu bus bound for Shiozawa Onsen via school, and get off at Shiozawa Onsen.
Operating period: daily
Fare: ¥500
Travel time: 37 minutes
Bus TimetableNihonmatsu Station → Shiozawa Onsen Bus Timetable
| Nihonmatsu Station | Shiozawa Onsen |
|---|---|
| 11:23 | 12:00 |
| 13:43 | 14:20 |
| 15:43 | 16:20 |
| 17:28 | 18:05 |
| Nihonmatsu Station | Shiozawa Onsen |
|---|---|
| 7:48 | 8:25 |
| 10:10 | 10:47 |
| 13:43 | 14:20 |
| 16:28 | 17:05 |
Reference: [Navitime]
4. [Return] Okudake Trailhead → Nihonmatsu Station (bus)
Operating period:
Weekdays: year-round
Sat/Sun: Sat/Sun only from May 9 – May 31, 2026 (Shinryoku-go) / extra mountain-opening services on Sunday May 17
※ During autumn-foliage season (October – November), Kinshu-go is scheduled to operate
Travel time: 45 minutes
Fare: ¥800
Reference: Fukushima Kotsu “Okudake Service / Shinryoku-go” 2026 edition
Bus TimetableOkudake → Dake Onsen → Nihonmatsu Station Bus Timetable
| Okudake Trailhead | Nihonmatsu Station |
|---|---|
| 16:15 | 16:59 |
| Okudake Trailhead | Dake Onsen Arr. | Dake Onsen Dep. | Nihonmatsu Station |
|---|---|---|---|
| 12:20 | 12:40 | 12:50 | 13:14 |
| 15:30 | 15:50 | 16:22 | 16:46 |
Reference: [Fukushima Kotsu]
5. [Return] Shiozawa Trailhead → Nihonmatsu Station
From the Shiozawa Onsen bus stop, take the Fukushima Kotsu bus bound for Nihonmatsu via school, and get off at Nihonmatsu Station.
Operating period: daily
Fare: ¥500
Travel time: 34 minutes
Bus TimetableShiozawa Onsen → Nihonmatsu Station Bus Timetable
| Shiozawa Onsen | Nihonmatsu Station |
|---|---|
| 7:10 | 7:44 |
| 12:05 | 12:39 |
| 14:25 | 14:59 |
| 16:25 | 16:59 |
| Shiozawa Onsen | Nihonmatsu Station |
|---|---|
| 8:30 | 9:04 |
| 11:00 | 11:34 |
| 14:25 | 14:59 |
| 17:10 | 17:44 |
Reference: [Navitime]
Photo by satoru otake
Your next mountain
One of Japan's 100 Famous Mountains featuring bog pools, a high alpine wetland, massive boulders, and Chinguruma blooms amid autumn color.
One of Japan's 100 Famous Mountains known as the Aizu Fuji, whose great eruption created the mystical Goshiki-numa lakes.
The highest peak of the Abukuma Highlands, uniquely combining the Horyū Shrine summit and the limestone cave at the foot.
A northern Oze ridge peak carpeted with Osabagrasa ferns, complemented by the Tashiro-yama wetland for a quiet mountain journey.
Climbed it? Stamp your logbook