Mt. Akaishi
More figures and data sources
Mt. Akaishi (赤石岳) is a 3,121m peak located in the southern Southern Alps, straddling Nagano and Shizuoka Prefectures.
It is the fourth-highest peak in the Southern Alps after Mt. Kita, Mt. Ainodake, and Mt. Warusawa, and is selected as one of the 100 Famous Japanese Mountains and the New 100 Famous Japanese Mountains.
For Mt. Akaishi, the common route is a loop including Mt. Arakawa from the Sawarajima trailhead.
Although it is a hard-to-access mountain area in the southern Southern Alps, during the season access is possible using the Mainichi Alpen-go (overnight bus), the Southern Alps Hiking Line (Shizutetsu Bus), and the Tokushu Tokai Forest shuttle bus.
Mt. Akaishi 2026 Season Access Notes
In 2026 there is no direct Mainichi Alpen-go service from Tokyo (Takebashi/Shinjuku) to Hatanagi. To reach Sawarajima you travel to Shizuoka Station, take one of the three Shizuoka departures to the Hatanagi summer parking area, and change there to the Tokai Forest shuttle bus.
- Tokai Forest shuttle bus (Sawarajima Lodge ⇔ Hatanagi Dai-ichi Dam): for guests of the affiliated huts only (tent-only trips are not eligible), reservation required. Scheduled service for 2026 ended on 12 October (timetable period 11 July – 12 October); from 13 October departure times are arranged individually with a lodge booking because of forest-road works. Official
- Shizutetsu Just Line Southern Alps Hiking Line (Shizuoka Station ⇔ Hatanagi): daily from 16 July to 16 August 2026 — this season has ended. 2026 guide
- Chiyoda Taxi Access Pack: 8-seat capacity, reservation required.
- Mainichi Alpen-go from Shizuoka Station (Shizuoka Station ⇔ Hatanagi/Numadaira): hikers only, reservation required. The 2026 operating days are listed in the timetables below. Official
- Ina Bus Southern Alps Hiking Bus Torikura Line (Nagano side): Operating July 18 – August 30, 2026 (official confirmed). Ina Bus
For access from the Torikura trailhead, refer to the Mt. Shiomi page.
*Timetable last checked: May 22, 2026
Map
Access status
Season overIna Bus South Alps bus, Torikura Line (Ina-Ōshima Sta. → Torikura trailhead)Bus to the Torikura trailhead for Shiomi-dake / Sanpuku Pass
Ina Bus states that this year’s summer service on the Torikura Line has ended. In 2026 it ran from 18 July to 30 August. Next year’s period will be announced next season.
Alternative: While there is no bus, the usual option is a taxi from Ina-Ōshima Station or the Matsukawa IC on the Chūō Expressway. Before you go, check the forest-road status and the operating periods of huts such as Sanpuku-tōge Hut.
Based on the Ina Bus (South Alps bus, Torikura Line) of 31 August 2026; we checked the content ourselves on 3 October 2026. Source
Season overShizuoka Sta. ⇄ Hatanagi climbers’ transport (Chiyoda Taxi, Mainichi Alpen-go from Shizuoka)Shizuoka-side access to the southern South Alps (Hatanagi / Sawarajima)
Chiyoda Taxi’s South Alps climbers’ service (Shizuoka Sta. north exit ⇄ Hatanagi temporary car park) made its last 2026 run on 27 September. The Mainichi Alpen-go from Shizuoka (Hatanagi / Numadaira) also has no bookable dates as of 3 October. Tokushu Tōkai Forest’s shuttle (Hatanagi car park ⇄ Sawarajima) runs on schedule until 12 October; from 13 October, because of forest-road works, pick-up times are arranged individually after you book the lodge (only for guests staying at least one night at a hut or lodge).
Alternative: In October there is no public transport from the Shizuoka side to Hatanagi. Drive to the Hatanagi summer temporary car park, or consider access from the Nagano side (e.g. taxis on the Ina side). Check each hut’s operating period as well.
Based on the Chiyoda Taxi (South Alps climbers’ service) / Tokushu Tōkai Forest (shuttle) / maitabi of 28 September 2026; we checked the content ourselves on 3 October 2026. Source
Hiking Course Details — Mt. Akaishi
Click to show current location.
Click for full-screen view.
*If the map does not appear, please click here.*
Map & Recommended Route — Mt. Akaishi
Mt. Akaishi — Reference Hiking Times
| Segment | Distance | Ascent/Descent | Out | Back |
|---|---|---|---|---|
| Sawara-jima → Akaishi Hut | 4.7 km | +1486 m / −67 m | 4:20 | 4:35 |
| Akaishi Hut → Mt. Akaishi | 3.1 km | +724 m / −153 m | 2:55 | 2:40 |
| Round trip | 15.7 km | +2431 m / −2431 m | 15:40 | |
1. [Outbound] Shizuoka Station → Sawarajima Lodge
In 2026 there is no Mainichi Alpen-go running directly from Tokyo (Takebashi/Shinjuku) to Hatanagi (the Takebashi→Hatanagi service that ran until around 2019 is not sold in 2026). From Tokyo, travel to Shizuoka Station and use the Shizuoka departures in Step 1. For an overnight connection, the Shizutetsu Justline highway bus (Busta Shinjuku 22:55 → Shizuoka Station 2:22, as noted by Maitabi) connects to the 4:15/4:20 departures next morning.
Step 1. Shizuoka Station → Hatanagi summer parking (three options)
Bus Timetable: Shizuoka Station → Hatanagi / Numadaira (Mainichi Alpen-go from Shizuoka, reservation only)
| Shizuoka Sta. South Exit dep. | Hatanagi summer parking arr. | Numadaira gate arr. |
|---|---|---|
| 4:15 | 7:20 | 7:30 |
Fare: ¥14,500–16,500 (varies by date). Ride: about 3 hours. Booking: Maitabi (official)
Shared-taxi Timetable: Shizuoka Station → Hatanagi (Chiyoda Taxi South Alps hikers’ shuttle)
| Shizuoka Sta. North Exit dep. | Hatanagi summer parking arr. |
|---|---|
| 4:20 | 7:20 |
Fare: ¥8,500 (one way, tax incl.). Booking: Chiyoda Taxi (official)
Bus Timetable: Shizuoka Station → Hatanagi (Shizutetsu Justline South Alps line)
| Shizuoka Sta. stop 8 dep. | Shirakaba-sō arr. | Hatanagi parking arr. |
|---|---|---|
| 10:00 | 13:10 | 13:20 |
Fare: adult ¥5,000 (incl. luggage). Ride: about 3 h 20 min. Reference: Shizutetsu Bus 2026 notice
* The early buses (Alpen-go 4:15 / Chiyoda 4:20) arrive at Hatanagi at 7:20 and connect to the 7:30 Tokai Forest shuttle. The Shizutetsu bus (arr. 13:20) connects to the 15:00 shuttle.
Step 2. Hatanagi summer parking → Hijirisawa Trailhead (Tokai Forest shuttle, get off en route)
At the Hatanagi summer temporary parking lot, transfer to the Tokushu Tokai Forest shuttle (Hatanagi → Sawarajima Lodge) and get off en route at the Hijirisawa Trailhead. The shuttle is
Step 2. Hatanagi Summer Temporary Parking → Sawarajima Lodge
At Hatanagi Summer Temporary Parking, transfer to the bus operated by “Tokushu Tokai Forest Co., Ltd.” and get off at Sawarajima Lodge. (Reservation required)
Reference: Sawarajima Lodge shuttle bus
Travel time: about 1 hour
| Hatanagi Summer Temporary Parking Dep. | Sawarajima Lodge Arr. |
|---|---|
| 7:30 | 8:40 |
| 15:00 | 16:10 |
2. [Return] Sawarajima Lodge → Shizuoka Station
Step 1. Sawarajima Lodge → Hatanagi Summer Temporary Parking
From Sawarajima Lodge, board the bus operated by “Tokushu Tokai Forest Co., Ltd.” and get off at Hatanagi Summer Temporary Parking. (Reservation required)
Reference: Sawarajima Lodge shuttle bus
Travel time: about 1 hour
| Sawarajima Lodge Dep. | Hatanagi Summer Temporary Parking Arr. |
|---|---|
| 6:10 | 7:20 |
| 10:30 | 11:40 |
| 13:00 | 14:10 |
Step 2. Hatanagi summer parking → Shizuoka Station (three options)
Bus Timetable: Numadaira / Hatanagi → Shizuoka Station (Mainichi Alpen-go)
| Numadaira gate dep. | Hatanagi parking dep. | Shirakaba-sō dep. | Shizuoka Sta. arr. |
|---|---|---|---|
| 14:50 | 15:00 | 15:05 | 18:00 |
Fare: ¥7,000–9,000
Shared-taxi Timetable: Hatanagi → Shizuoka Station (Chiyoda Taxi)
| Hatanagi parking dep. | Shirakaba-sō dep. | Shizuoka Sta. North Exit arr. |
|---|---|---|
| 7:35 | 7:45 | 10:40 |
Fare: ¥8,500 (one way, tax incl.). Booking: Chiyoda Taxi (official)
Bus Timetable: Hatanagi → Shizuoka Station (Shizutetsu Justline South Alps line)
| Hatanagi parking dep. | Shirakaba-sō dep. | Shizuoka Sta. arr. |
|---|---|---|
| 14:30 | 14:40 | 17:50 |
Fare: adult ¥5,000 (incl. luggage). Ride: about 3 h 20 min. Reference: Shizutetsu Bus 2026 notice
Photo by T hino
Photo byT hino
Your next mountain
A 3,000-meter peak deep in the southern Alps, captivating climbers with untouched primeval forest and majestic mountain scenery.
A great mountain cluster of three summits in the central southern Alps, crowned by the panoramic Waru-sawadake.
A pivotal summit on the Omote-Ginza traverse, concentrating the full sweep from Yarigatake and Hotaka to the Tateyama range into one view.
Climbed it? Stamp your logbook